| Administrative Modifications to the Evansville MPO FY 2010 - 2013 TIP | ||||
| Date | DES/Item# | Project Description | Text Change | Prior Status/Change |
| 3/16/2010 | 0300578 | Intersection realignment project at Plum St., Main St. and Jennnings | FY 2010 CN 509,803 HES/HSIP | FY 2010 CN 460,000 HES |
| St. in Newburgh. Revise project budget. | 5,534 LOCAL | 18,000 LOCAL | ||
| 3/25/2010 | 02-2040.00 | Audubon Parkway - Repair and grind pavement from 0.178 mi. | FY 2010 PE 300,000 FS2 | Add PE to TIP |
| W. of KY 6110 to Daviess County line. Add design funding | ||||
| 3/29/2010 | 02-2040.00 | Audubon Parkway - Repair and grind pavement from 0.178 mi. | FY 2010 PE 300,000 NHS | FY 2010 PE 300,000 FS2 |
| W. of KY 6110 to Daviess County line. Change design funding | ||||
| 4/19/2010 | 9903240 | US 41 - Road reconstruction from 0.2 mi. N of S jct. with SR 66 | FY 2010 PE 31,200 NHS | FY 2010-12 PE 229,000 NHS |
| to 0.4 mi. S of N jct. with SR 66. Revise cost and schedule to split | 7,800 INDOT | 45,800 INDOT | ||
| single phase project into two phases | FY 2010 ROW 128,000 NHS | FY 2012 ROW 128,000 NHS | ||
| Note: Original limits were Eagle Creek Slough to 0.3 mi. S of | 32,000 INDOT | 32,000 INDOT | ||
| SR 66 | FY 2010 CN 8,000,000 NHS | FY 2013 CN 26,240,000 NHS | ||
| 2,000,000 INDOT | 6,560,000 INDOT | |||
| 4/19/2010 | 1000069 | US 41 - Road reconstruction from Eagle Creek Slough to 0.2 mi. S | FY 2012 PE 32,000 NHS | See above - Add Second Phase |
| of S jct. with SR 66. Revise cost and schedule to split single | 8,000 INDOT | |||
| phase project into two phases | FY 2013 CN 18,240,000 NHS | |||
| 4,560,000 INDOT | ||||
| 7/30/2010 | 1005569 | Interlake Multi-Use Recreation Area: | FY 2011 PE 40,000 RTP | FY 2011 CN 655,392 RTP |
| DNR project to develop multi-use recreational park at Interlake, a | 10,000DNR | 163,848 DNR | ||
| 3500 acre property near Lynnville in Warrick County. Revise cost | FY 2011 CN 615,392 RTP | |||
| to include PE funding | 153,848 DNR | |||